What the crew called a "TKO machine" (a tie remover/inserter) travels down the tracks, removing the marked crossties. Clamps grasp the railheads and hydraulic jacks push off the ground, lifting the rails from the ties. Then the hydraulic arm grabs the old tie and pulls it straight out, leaving it alongside the tracks.

March 11, 1998