In San Carlos the tracks have been ripped out and a shoofly has been constructed on the other side of the depot, where the parking lot used to be. A fill will be constructed on the old roadbed where the new tracks will be elevated to eliminate three grade crossings in Belmont and San Carlos.
December 31, 1997
|