Dan's Depot presents...







Altamont Commuter Express Gallery
Page 1

Amtrak Gallery
Page 1
Page 2
Page 3
Page 4
Page 5

Caltrain Gallery
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Ralston-Harbor-Holly Project
Page 1
Page 2
Ponderosa Project
Page 1

Union Pacific Gallery
Page 1
Page 2
Page 3
Page 4
Page 5
Maintenance of Way
Page 1
Page 2

Miscellaneous Gallery
Page 1
Page 2
Page 3
 

Amtrak: Page 2

Click on the thumbnails to enlarge the images.

The engineer hangs out the door of 116 for some fresh air as the baggage car is frantically loaded and unloaded.
March 20, 1998
The Starlight is a busy train today. It is the beginning of Spring Break for Cal Poly students, and many take the train home.
March 20, 1998
When the man in this photo asked this attendant to snap a photo of he and his family in front of their sleeping car, she gladly did it for them.
March 20, 1998
UP 9438 waits its turn while the northbound Starlight finishes up at San Luis Obispo.
March 31, 1998
The southbound Starlight crawls past Cal Poly's agricultural science area with slow orders, most likely due to the fresh layer of untamped ballast piled high between the rails.
April 1998
The Starlight (with P42DC 120 in the lead) stops underneath the pedestrian bridge in San Luis Obispo on its way to LA.
April 18, 1998
The southbound Starlight stretches out across Stenner Creek Trestle.
April 22, 1998
A few seconds later the train twists into a backwards "S" shape while navigating two curves.
April 22, 1998
Just minutes later, the northbound Starlight sqeaks past Chorro Siding behind and up above Stenner Creek Trestle.
April 22, 1998
At the end of Chorro Siding the train encounters the first of five tunnels it will pass through in Cuesta Pass.
April 22, 1998


All contents copyright © 1999, Dan's Depot. All rights reserved.